[ Music Shed Restoration ]

Time Table & Costs

Timetable

The first step was completed in 2010 with the installation of culverts and a patio to stabilize the drainage on the west side of the building. Next John G. Waite Associates will complete a Historic Structure Report – a history of the Music Shed and detailed description of the architectural and acoustic properties of the building. Their report will serve as the basis for plans for the renovation of the Shed and design of the new Music Studio Space. Construction will take place in two phases so the summer concert season is not interrupted.

September 2012:
December 2012:
Spring 2013:
Fall 2014 – Spring 2016:
Fall 2015:
Completion of Historic Structure Report
Architectural designs complete
Drainage corrected on north and east sides
Music Shed restoration Phase 1
Music Shed restoration Phase 2

 

Project Costs

Historic Structure Report, Drawings
Shed Restoration
Music Restoration Phase 2 and Studio Space
$ 245,000
$ 2,400,000
$ 4,000,000